特级做A爰片毛片免费69,永久免费AV无码不卡在线观看,国产精品无码av地址一,久久无码色综合中文字幕

110kv降壓變電站電氣設(shè)計(本科畢業(yè)設(shè)計)cad圖.zip

ZIP格式版權(quán)申訴手機打開展開

110kv降壓變電站電氣設(shè)計(本科畢業(yè)設(shè)計)cad圖,本資料包括2部分,第一部分是完整畢業(yè)論文,第二部分是配套cad圖紙,此為第二部分,另外配套完整畢業(yè)論文請參看:http:///docs/144931/摘 要隨著經(jīng)濟的發(fā)展和現(xiàn)代工業(yè)建設(shè)的迅速崛起,供電系統(tǒng)的設(shè)計越來越全面、系統(tǒng),工廠用電量迅速增長,對電能質(zhì)量、技術(shù)經(jīng)濟狀況、供電的可靠性指標...
編號:40-146472大小:722.67K
分類: 論文>電氣自動化/電力論文

該文檔為壓縮文件,包含的文件列表如下:

內(nèi)容介紹

原文檔由會員 zaixian 發(fā)布

本資料包括2部分,第一部分是完整畢業(yè)論文,第二部分是配套CAD圖紙,此為第二部分,另外配套完整畢業(yè)論文請參看:

http:///docs/144931/



摘 要



隨著經(jīng)濟的發(fā)展和現(xiàn)代工業(yè)建設(shè)的迅速崛起,供電系統(tǒng)的設(shè)計越來越全面、系統(tǒng),工廠用電量迅速增長,對電能質(zhì)量、技術(shù)經(jīng)濟狀況、供電的可靠性指標也日益提高,因此對供電設(shè)計也有了更高、更完善的要求。設(shè)計是否合理,不僅直接影響基建投資、運行費用和有色金屬的消耗量,也會反映在供電的可靠性和安全生產(chǎn)方面,它和企業(yè)的經(jīng)濟效益、設(shè)備人身安全密切相關(guān)。

變電站是電力系統(tǒng)的一個重要組成部分,由電器設(shè)備及配電網(wǎng)絡(luò)按一定的接線方式所構(gòu)成,他從電力系統(tǒng)取得電能,通過其變換、分配、輸送與保護等功能,然后將電能安全、可靠、經(jīng)濟的輸送到每一個用電設(shè)備的轉(zhuǎn)設(shè)場所。作為電能傳輸與控制的樞紐,變電站必須改變傳統(tǒng)的設(shè)計和控制模式,才能適應(yīng)現(xiàn)代電力系統(tǒng)、現(xiàn)代化工業(yè)生產(chǎn)和社會生活的發(fā)展趨勢。隨著計算機技術(shù)、現(xiàn)代通訊和網(wǎng)絡(luò)技術(shù)的發(fā)展,為目前變電站的監(jiān)視、控制、保護和計量裝置及系統(tǒng)分隔的狀態(tài)提供了優(yōu)化組合和系統(tǒng)集成的技術(shù)基礎(chǔ)。

110KV變電站屬于高壓網(wǎng)絡(luò),該地區(qū)變電所所涉及方面多,考慮問題多,分析變電所擔負的任務(wù)及用戶負荷等情況,選擇所址,利用用戶數(shù)據(jù)進行負荷計算,確定用戶無功功率補償裝置。同時進行各種變壓器的選擇,從而確定變電站的接線方式,再進行短路電流計算,選擇送配電網(wǎng)絡(luò)及導(dǎo)線,進行短路電流計算。選擇變電站高低壓電氣設(shè)備,為變電站平面及剖面圖提供依據(jù)。本變電所的初步設(shè)計包括了:(1)總體方案的確定(2)負荷分析(3)短路電流的計算(4)高低壓配電系統(tǒng)設(shè)計與系統(tǒng)接線方案選擇(5)繼電保護的選擇與整定(6)防雷與接地保護等內(nèi)容。

隨著電力技術(shù)高新化、復(fù)雜化的迅速發(fā)展,電力系統(tǒng)在從發(fā)電到供電的所有領(lǐng)域中,通過新技術(shù)的使用,都在不斷的發(fā)生變化。變電所作為電力系統(tǒng)中一個關(guān)鍵的環(huán)節(jié)也同樣在新技術(shù)領(lǐng)域得到了充分的發(fā)展。



關(guān)鍵詞:變電站、負荷、補償裝置、配電系統(tǒng)



















Abstract



Along with the economic development and the modern industry developments of quick rising, the design of the power supply system become more and more completely and system. Because the quickly increase electricity of factories, it also increases seriously to the dependable index of the economic condition, power supply in quantity. Therefore they need the higher and more perfect request to the power supply. Whether Design reasonable, not only affect directly the base investment and circulate the expenses with have the metal depletion in colour metal, but also will reflect the dependable in power supply and the safe in many facts. In a word, it is close with the economic performance and the safety of the people.

The substation is an importance part of the electric power system, it is consisted of the electric appliances equipments and the Transmission and the Distribution. It obtains the electric power from the electric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical. As an important part of power’s transport and control, the transformer substation must change the mode of the traditional design and control, then can adapt to the modern electric power system, the development of modern industry and the of trend of the society life.

The region of 110-voltage effect many fields and should consider many problems. Analyse change to give or get an electric shock a mission for carrying and customers carries etc. circumstance, choose the address, make good use of customer data proceed then carry calculation, ascertain the correct equipment of the customer. At the same time following the choice of every kind of transformer, then make sure the line method of the transformer substation, then calculate the short-circuit electric current, choosing to send together with the electric wire method and the style of the wire, then proceeding the calculation of short-circuit electric current. This first step of design included:(1) ascertain the total project (2) load analysis(3) the calculation of the short-circuit electric current (4) the design of an electric shock the system design to connect with system and the choice of line project (5) the choice and the settle of the protective facility (6) the contents to defend the thunder and protection of connect the earth. Along with the high and quick development of electric power technique, electric power system then can change from the generate of the electricity to the supply the power.



Key words:substation ,load ,transmission system , distribution ,

high voltage network ,correction equipment.















































目 錄





第一章 緒論 1

第一節(jié) 變電站發(fā)展的歷史與現(xiàn)狀 1

一﹑概況 1

二﹑變電站綜合自動化系統(tǒng)的設(shè)計原則 1

第二節(jié) 課題來源及設(shè)計背景 2

一﹑課題來源 2

二﹑設(shè)計背景 2

第二章 變電站負荷..