外文翻譯------變電站電纜自動化系統(tǒng)的有效計劃.doc
約11頁DOC格式手機打開展開
外文翻譯------變電站電纜自動化系統(tǒng)的有效計劃,abstract the manual selection and assignment of appropriate cables to the interconnections between the devices of a substation automation system is a major cost...
內(nèi)容介紹
此文檔由會員 wanli1988go 發(fā)布
Abstract The manual selection and assignment of appropriate cables to the interconnections between the devices of a substation automation system is a major cost factor in substation automation system design. This paper discusses about the modeling of the substation automation system cable planning as an integer linear optimization problem to generate an efficient cable plan for substation automation systems.
1 Introduction
Cabling between different devices of a substation automation system (SAS) is a major cost factor in the SAS design process. Usually computer aided design software is used to create the design templates of SAS devices and their interconnections. The design templates are then instantiated in a SAS project and the cables are manually assigned to the connections. The selection and assignment of cables to connections must follow certain engineering rules. This engineering process is usually time consuming and can cause engineering errors, thereby increasing the engineering cost. Apparently, the SAS cable planning is related to the well known bin packing problem. The SAS cable planning can be formulated as an integer linear optimization problem with the cable engineering rules expressed as a set of linear constraints and a cost objective for minimizing the total cable cost. This paper describes the formulation of SAS cable planning problem as an integer linear optimization problem and presents the results for some representative test cases. To the best of the authors’ knowl
摘要:手動選擇和適當?shù)姆峙潆娎|,在變電站自動化系統(tǒng)的設計時,對變電站自動化系統(tǒng)之間的聯(lián)系的是一個主要成本因素。本文論述了變電站自動化系統(tǒng)電纜計劃的建模作為一個整數(shù)線性優(yōu)化問題來生成一個高效的變電站電纜自動化系統(tǒng)的計劃。
1簡介
在變電站自動化系統(tǒng)設計(SAS)過程中,不同設備之間的接線是變電站自動化系統(tǒng)的一個主要成本因素。通常計算機輔助設計軟件是用來創(chuàng)建變電站自動化系統(tǒng)設計模板的和設備之間的聯(lián)系。然后手動分配連接變電站自動化系統(tǒng)設計模板項目和電纜。選擇和分配電纜連接必須遵循一定的工程規(guī)則。這個過程通常是耗費時間,并可導致工程錯誤增加工程的成本的工程。顯然,SAS電纜規(guī)劃是眾所周知的裝箱問題。SAS公司的電纜計劃可以制定為一個整數(shù)線性優(yōu)化問題,與電纜工程規(guī)則表示為一組線性約束和成本目標的譆@殺咀钚』繢?。本文描孰h薙AS電纜規(guī)劃問題作為一個整數(shù)線性優(yōu)化問題,提出了具有代表性的測試用例的結果方案。對作者的來說最大的收獲是學習SAS電纜規(guī)劃。
本文組要內(nèi)容如下。第二節(jié)介紹SAS電纜規(guī)劃過程。第三節(jié)表述了SAS電纜規(guī)劃問題作為一個整數(shù)線性優(yōu)化問題。第四節(jié)通過求解該優(yōu)化問題獲得的
1 Introduction
Cabling between different devices of a substation automation system (SAS) is a major cost factor in the SAS design process. Usually computer aided design software is used to create the design templates of SAS devices and their interconnections. The design templates are then instantiated in a SAS project and the cables are manually assigned to the connections. The selection and assignment of cables to connections must follow certain engineering rules. This engineering process is usually time consuming and can cause engineering errors, thereby increasing the engineering cost. Apparently, the SAS cable planning is related to the well known bin packing problem. The SAS cable planning can be formulated as an integer linear optimization problem with the cable engineering rules expressed as a set of linear constraints and a cost objective for minimizing the total cable cost. This paper describes the formulation of SAS cable planning problem as an integer linear optimization problem and presents the results for some representative test cases. To the best of the authors’ knowl
摘要:手動選擇和適當?shù)姆峙潆娎|,在變電站自動化系統(tǒng)的設計時,對變電站自動化系統(tǒng)之間的聯(lián)系的是一個主要成本因素。本文論述了變電站自動化系統(tǒng)電纜計劃的建模作為一個整數(shù)線性優(yōu)化問題來生成一個高效的變電站電纜自動化系統(tǒng)的計劃。
1簡介
在變電站自動化系統(tǒng)設計(SAS)過程中,不同設備之間的接線是變電站自動化系統(tǒng)的一個主要成本因素。通常計算機輔助設計軟件是用來創(chuàng)建變電站自動化系統(tǒng)設計模板的和設備之間的聯(lián)系。然后手動分配連接變電站自動化系統(tǒng)設計模板項目和電纜。選擇和分配電纜連接必須遵循一定的工程規(guī)則。這個過程通常是耗費時間,并可導致工程錯誤增加工程的成本的工程。顯然,SAS電纜規(guī)劃是眾所周知的裝箱問題。SAS公司的電纜計劃可以制定為一個整數(shù)線性優(yōu)化問題,與電纜工程規(guī)則表示為一組線性約束和成本目標的譆@殺咀钚』繢?。本文描孰h薙AS電纜規(guī)劃問題作為一個整數(shù)線性優(yōu)化問題,提出了具有代表性的測試用例的結果方案。對作者的來說最大的收獲是學習SAS電纜規(guī)劃。
本文組要內(nèi)容如下。第二節(jié)介紹SAS電纜規(guī)劃過程。第三節(jié)表述了SAS電纜規(guī)劃問題作為一個整數(shù)線性優(yōu)化問題。第四節(jié)通過求解該優(yōu)化問題獲得的