新建660mw超臨界機組鍋爐割管檢查.doc
約8頁DOC格式手機打開展開
新建660mw超臨界機組鍋爐割管檢查,摘 要:隨著我國經(jīng)濟、社會發(fā)展,國家降低能耗、節(jié)能減排政策的不斷深入,火電機組不斷向高參數(shù)、大容量方向發(fā)展,目前國內超臨界、超超臨界鍋爐開始大量、集中建設和投運,從已投運機組的試運及投運后的運行情況來看,頻繁爆管是困擾超、超超臨界機組的一個主要問題,割管檢查此項工作開展時間不長,經(jīng)驗不是很多,本文主要介紹電廠2×660...
內容介紹
此文檔由會員 牛奶咖啡 發(fā)布
摘 要:隨著我國經(jīng)濟、社會發(fā)展,國家降低能耗、節(jié)能減排政策的不斷深入,火電機組不斷向高參數(shù)、大容量方向發(fā)展,目前國內超臨界、超超臨界鍋爐開始大量、集中建設和投運,從已投運機組的試運及投運后的運行情況來看,頻繁爆管是困擾超、超超臨界機組的一個主要問題,割管檢查此項工作開展時間不長,經(jīng)驗不是很多,本文主要介紹電廠2×660MW超超臨界機組在建設過程中割管檢查的部位、檢查方法,檢查效果等進行介紹。
關鍵詞:新建機組;鍋爐防爆;割管檢查;實例分析
Abstract: As China's economic and social development, the state to reduce energy consumption, energy-saving emission reduction policies, continued to deepen,Thermal power unit to keep the high-parameter, large-capacity develop in the direction。Domestic supercritical, ultra supercritical boilers began to large, concentrated efforts to build and put into operation in,Generating units have been put into operation from the trial operation and put into operation after the operation point of view, frequently burst pipe is troubled super, ultra-supercritical unit in a major problem。Cutting tube inspections to carry out this work is not long, experience, not many。This paper describes xing chang Plant 2×660MW USC In the construction process the site of cutting tube inspections, inspection methods, inspection results, etc. are introduced
Key words: New Units; Boiler Explosion; Cutting tube inspections; Case Study
關鍵詞:新建機組;鍋爐防爆;割管檢查;實例分析
Abstract: As China's economic and social development, the state to reduce energy consumption, energy-saving emission reduction policies, continued to deepen,Thermal power unit to keep the high-parameter, large-capacity develop in the direction。Domestic supercritical, ultra supercritical boilers began to large, concentrated efforts to build and put into operation in,Generating units have been put into operation from the trial operation and put into operation after the operation point of view, frequently burst pipe is troubled super, ultra-supercritical unit in a major problem。Cutting tube inspections to carry out this work is not long, experience, not many。This paper describes xing chang Plant 2×660MW USC In the construction process the site of cutting tube inspections, inspection methods, inspection results, etc. are introduced
Key words: New Units; Boiler Explosion; Cutting tube inspections; Case Study
TA們正在看...
- 01.1四時田園雜興課堂教學教案教學設計(部編版).doc
- 01.2稚子弄冰課堂教學教案教學設計(部編版).doc
- 01.3村晚課堂教學教案教學設計(部編版).doc
- 02冬陽·童年·駱駝隊公開課優(yōu)秀教案教學設計(五年...doc
- 02冬陽·童年·駱駝隊最新教研教案教學設計(部編版...doc
- 02冬陽·童年·駱駝隊課堂教學教案教學設計(部編版).doc
- 03祖父的園子公開課優(yōu)秀教案教學設計(五年級下冊).doc
- 03祖父的園子最新教研教案教學設計(部編版五年級下...doc
- 03祖父的園子課堂教學教案教學設計(部編版).doc
- 04草船借箭公開課優(yōu)秀教案教學設計(五年級下冊).doc