特级做A爰片毛片免费69,永久免费AV无码不卡在线观看,国产精品无码av地址一,久久无码色综合中文字幕

預(yù)應(yīng)力連續(xù)梁橋設(shè)計.rar

RAR格式版權(quán)申訴手機打開展開

預(yù)應(yīng)力連續(xù)梁橋設(shè)計,包括任務(wù)書,開題報告,設(shè)計書,翻譯資料摘 要畢業(yè)設(shè)計主要是關(guān)于小跨度預(yù)應(yīng)力混凝土連續(xù)梁橋上部結(jié)構(gòu)的設(shè)計。預(yù)應(yīng)力混凝土連續(xù)梁橋以結(jié)構(gòu)受力性能好、變形小、伸縮縫少、行車平順舒適、養(yǎng)護工程量小、抗震能力強等而成為最富有競爭力的主要橋型之一。受時間和個人能力的限制,本次畢業(yè)設(shè)計沒有具體涉及到下部結(jié)構(gòu)、橫向預(yù)應(yīng)...
編號:58-88999大小:759.03K
分類: 論文>土木工程/建筑論文

該文檔為壓縮文件,包含的文件列表如下:

內(nèi)容介紹

原文檔由會員 tts123 發(fā)布

預(yù)應(yīng)力連續(xù)梁橋設(shè)計

包括任務(wù)書,開題報告,設(shè)計書,翻譯資料

摘 要

畢業(yè)設(shè)計主要是關(guān)于小跨度預(yù)應(yīng)力混凝土連續(xù)梁橋上部結(jié)構(gòu)的設(shè)計。預(yù)應(yīng)力混凝土連續(xù)梁橋以結(jié)構(gòu)受力性能好、變形小、伸縮縫少、行車平順舒適、養(yǎng)護工程量小、抗震能力強等而成為最富有競爭力的主要橋型之一。受時間和個人能力的限制,本次畢業(yè)設(shè)計沒有具體涉及到下部結(jié)構(gòu)、橫向預(yù)應(yīng)力及豎向預(yù)應(yīng)力的設(shè)計。
設(shè)計橋梁跨度為2×30m,為單箱雙室,橋面寬12m,分為2車道。主梁施工采用滿堂支架施工。
設(shè)計過程如下:
首先,確定主梁主要構(gòu)造及細部尺寸,它必須與橋梁的規(guī)定和施工保持一致,設(shè)計采用箱形梁。頂板、底板厚度沿全橋保持不變,均為0.25m。
其次,利用橋梁博士分析內(nèi)力結(jié)構(gòu)總的內(nèi)力(包括恒載和活載的內(nèi)力計算)。用于計算的內(nèi)力組合結(jié)果也由橋梁博士計算而得,從而估算出縱向預(yù)應(yīng)力筋的數(shù)目,然后再布置預(yù)應(yīng)力鋼絲束。
再次,計算預(yù)應(yīng)力損失及次內(nèi)力,次內(nèi)力包括先期恒載徐變次內(nèi)力、先期預(yù)應(yīng)力徐變次內(nèi)力、局部溫度變化次內(nèi)力。
然后進一步進行截面強度的驗算,其中包括承載能力極限狀態(tài)和正常使用極限狀態(tài)。在正常使用極限狀態(tài)驗算中包括計算截面的混凝土法向應(yīng)力驗算、預(yù)應(yīng)力鋼筋中的拉應(yīng)力驗算、截面的主應(yīng)力計算

關(guān)鍵詞:預(yù)應(yīng)力混凝土連續(xù)梁橋 次內(nèi)力 支架現(xiàn)澆施工

Abstract
The graduate design is mainly about the design of superstructure of short-span pre-stressed concrete continuous box Girder Bridge. Pre-stressed concrete continuous Girder Bridge become one of main bridge types of the most full of competion ability because of subjecting to the dint function with the structure good, having the small deformation, few of control joint, going smoothly comfort, protected the amount of engineering small and having the powerfully ability of earthquake proof and so on. For time and ability limited, the design of the substructure, transverse pre-stressing and vertical pre-stressing is not considered.
The spans of the bridge are 2×30 m, main beam is respective designed, each suit has one box two room and two traffic ways, the width of the bridge surface is 12m.
The procedure of the design is listed below:
The first step as to dimension the structural elements and details of which it is composed, it can’t and certainly should without being fully coordinated with the planning and working phrases of the project. Considering the distorting stiffness and the bending stiffness, box birder goes as second-parabolic curve, for second-parabolic curve is generally similar to the change of continuous bridge’s bending moments along. The section at the support is strengthened by the provision of thickened webs , bottom slabs and a cross beam , the thickness of the bottom slab and the top slab is 0.25m.
The second step is to use Dr.Bridge3.03 to analyze internal gross force of the structures (including dead load and lived load), the internal force composition can be done by using the compute results. According to the internal force composite, the eva luated amount of longitudinal tendons can be worked out, then we can distribute the tendons to the bridge.
The third step is to calculate the loss of pre-stressing and secondary force due to pre-stressing, first dead loads and temperature, bearing displacement, and so on.
The last step is checking the main cross section. The work includes the load-caring capacity ultimate state and the normal service ability ultimate state as well as the main section’s being out of shape.

Key Words: grade separated Pre-stressed concrete continuous girder bridge Secondary force Full scaffold construction

目 錄
第1章 緒論 1
1.1 預(yù)應(yīng)力混凝土連續(xù)梁橋概述 1
1.2 畢業(yè)設(shè)計的目的與意義 1
第2章 橋跨總體布置及結(jié)構(gòu)尺寸擬定 3
2.1 尺寸擬定 3
2.1.1 立截面 3
2.1.2 橫截面 3
2.1.3 梁高 4
2.1.4 細部尺寸 4
2.2 主梁分段與施工階段的劃分 5
2.2.1 分段原則 5
2.2.2 具體分段 6
2.2.3 施工方法及注意事項 6
第3章 荷載內(nèi)力計算 7
3.1 恒載內(nèi)力計算 7
3.2 活載內(nèi)力計算 10
第四章 預(yù)應(yīng)力鋼束的估算與布置 11
4.1 計算原理 11
4.2 預(yù)應(yīng)力鋼束的估算 15
4.3 預(yù)應(yīng)力鋼束的布置 15
4.3.1 布束原則 15
4.3.2 具體布置 16
第五章 全橋結(jié)構(gòu)安全驗算 17
5.1 全橋安全驗算信息輸入 17
5.2 全橋結(jié)構(gòu)安全驗算 17
5.2.1 承載能力極限狀態(tài)驗算 17
5.2.2 正常使用階段驗算 17
5.3 施工階段組合應(yīng)力驗算 20
第6章 橋墩設(shè)計 22
6.1 截面選擇 22
6.2 橋墩計算模型的建立 22
6.3 內(nèi)力計算 23
6.4 計算配筋 24
6.5 結(jié)構(gòu)安全驗算 24
參考文獻 25
致謝語 26
附錄A 27
附錄B 34