橋梁畢業(yè)設(shè)計.rar
橋梁畢業(yè)設(shè)計,包括論文設(shè)計部分,施工組織設(shè)計部分及整套完整cad圖紙論文設(shè)計部分介紹及目錄摘要本設(shè)計是灤河大橋下部結(jié)構(gòu)設(shè)計,該橋全長99m,采用3跨的預(yù)應(yīng)力混凝土t型梁橋。確定橋梁下部結(jié)構(gòu)應(yīng)遵循安全耐久、滿足使用的要求,同時造價較低,維修養(yǎng)護方便,與周圍景觀相協(xié)調(diào)等原則。另外,橋梁下部結(jié)構(gòu)的設(shè)計與結(jié)構(gòu)受力、水文、地質(zhì)構(gòu)造...
該文檔為壓縮文件,包含的文件列表如下:
內(nèi)容介紹
原文檔由會員 4254423 發(fā)布橋梁畢業(yè)設(shè)計
包括論文設(shè)計部分,施工組織設(shè)計部分及整套完整cad圖紙
論文設(shè)計部分介紹及目錄
摘要
本設(shè)計是灤河大橋下部結(jié)構(gòu)設(shè)計,該橋全長99m,采用3跨的預(yù)應(yīng)力混凝土T型梁橋。確定橋梁下部結(jié)構(gòu)應(yīng)遵循安全耐久、滿足使用的要求,同時造價較低,維修養(yǎng)護方便,與周圍景觀相協(xié)調(diào)等原則。另外,橋梁下部結(jié)構(gòu)的設(shè)計與結(jié)構(gòu)受力、水文、地質(zhì)構(gòu)造等密切相關(guān),同時應(yīng)考慮地震、溫度影響力等作用。
在本設(shè)計中設(shè)計的橋墩型式采用了鉆孔灌注樁雙柱式橋墩,橋臺采用埋置式組合橋臺,鉆孔灌注樁基礎(chǔ)。根據(jù)設(shè)計資料和設(shè)計實例進行尺寸初步擬定,分別對蓋梁、樁身和樁基進行恒載、活載的計算與內(nèi)力組合,配筋設(shè)計和驗算。
計算中采用了杠桿法、偏心壓力法、m法等計算方法,充分考慮了可能對承載力造成影響的各種作用并進行合理組合,同時參照有關(guān)規(guī)范與規(guī)定進行設(shè)計與校核,使橋梁達到預(yù)期的設(shè)計要求。
關(guān)鍵詞:下部結(jié)構(gòu);橋墩;橋臺;蓋梁;樁基
目 錄
前言 1
1 橋型方案比選 2
1.1 技術(shù)設(shè)計標準 2
1.2 主要設(shè)計依據(jù) 2
1.3 工程地質(zhì)資料 2
1.4 水文資料 3
1.5 氣候資料 3
1.6 橋型擬定 3
2 支座的設(shè)計 6
2.1 板式橡膠支座的選用 6
2.2 計算支座反力 6
2.3 支座平面尺寸的確定 6
2.4 確定支座的厚度 7
2.5 支座偏轉(zhuǎn)情況的驗算 8
2.6 驗算支座的抗滑穩(wěn)定性 8
3 橋墩構(gòu)造設(shè)計 9
3.1 橋墩類型和主要材料 9
3.2 橋墩截面尺寸擬定 9
3.3 蓋梁計算 9
3.3.1 垂直荷載計算 10
3.3.2 雙柱反力 計算 15
3.3.3 蓋梁各截面內(nèi)力計算 16
3.3.4 各墩水平力計算 19
3.3.5 蓋梁配筋設(shè)計 22
3.4 墩柱計算 27
3.4.1 恒載計算 27
3.4.2 活載計算 27
3.4.3 墩柱配筋設(shè)計 28
3.4.4 墩身裂縫計算 34
3.5 樁基的設(shè)計[8] 35
4 橋臺的設(shè)計 43
4.1 橋臺類型和主要材料 43
4.2 橋臺一般構(gòu)造尺寸的擬定 43
4.3 臺帽計算 43
4.3.1 荷載計算 43
4.3.2 內(nèi)力計算 46
4.3.3 截面驗算 51
4.4 臺墻計算 53
4.4.1 垂直荷載計算 53
4.4.2 水平力計算 56
4.4.3 截面驗算 66
4.5 背墻計算 68
4.6 耳墻計算 69
4.6.1 活載等代土層厚度的計算 69
4.6.2 水平土壓力計算 69
4.6.3 截面計算 69
5 結(jié)論 71
致謝 72
參考文獻 73
施工組織設(shè)計部分介紹及目錄
摘要
施工組織設(shè)計是建筑施工組織的核心和靈魂,是對工程建設(shè)項目全過程的構(gòu)思設(shè)想和具體安排,用來指導(dǎo)施工項目全過程各項活動的技術(shù)、經(jīng)濟和組織的綜合性文件。編制時對項目管理機構(gòu)設(shè)置、施工總體部署、施工準備、主要分部分項工程施工方法、工程質(zhì)量保證措施、安全及文明施工措施、施工現(xiàn)場管理措施等諸多因素盡可能充分考慮,突出科學(xué)性、適用性及針對性,是確保優(yōu)質(zhì)、低耗、安全、文明、高速完成全部施工任務(wù)的重要經(jīng)濟技術(shù)文件。
本設(shè)計主要包括以下內(nèi)容:工程施工組織設(shè)計書、概預(yù)算、中英文翻譯。
為確保工期、質(zhì)量及安全、文明工地,節(jié)約成本等條件,編制出針對性的施工組織設(shè)計,每個分部分項工程的特點、結(jié)構(gòu)特征、施工難易程度工期和質(zhì)量要求,編制出切實可行的施工方案。以指導(dǎo)施工順利地完成本工程項目的建設(shè),控制工程成本,創(chuàng)建優(yōu)質(zhì)工程。
關(guān)鍵詞:工程; 施工;概預(yù)算
Abstract
Construction organization design is the core of construction organizations, and soul, is a construction project the idea of the whole process of ideas and specific arrangements for the project to guide the construction activities of the whole process of technical, economic and organizational comprehensive document. When the preparation of the project management structure, construction overall plan, construction preparation, some of the major sub-project construction methods, quality assurance measures, safety and civilized construction measures, construction site management and many other factors into account as fully as possible, highlighting scientific, applicability and relevance, is to ensure high-quality, low cost, safe, civilized, and high speed to complete all of the important tasks of economic and technological construction documents.
The design includes the following: The construction organization design books, budget, in English translation. In order to ensure time, quality and safety, civil construction site, cost and other conditions, the preparation of a specific construction design, each sub-segment of the engineering characteristics, structural features, construction schedule and quality requirements of ease of preparation of the practical construction program. To guide the construction of the successful completion of the construction of the project, control costs, create high-quality project.
Keywords: engineering; construction; General Budget
前言 1
1 編制說明及編制依據(jù) 2
1.1 編制依據(jù) 2
1.2 編制范圍 2
1.3 編制原則 2
2工程概況 3
2.1工程項目簡介 3
2.2工程項目特點 3
3 施工準備 5
3.1測量放樣 5
3.2 砼配合比及材料試驗 5
3.3 保證既有道路交通措施 5
4 鋼筋工程 6
4.1鋼筋的檢查 6
4.2鋼筋下料焊接 6
4.3鋼筋的綁扎、安裝 6
5 混凝土工程 7
5.1 原材料檢查 7
5.2 施工配合比確定 7
5.3 砼的拌和 7
5.4 砼的運輸 7
5.5 砼澆筑 7
5.6 砼的振搗 8
5.7 砼養(yǎng)生 8
6 模板、支架工程 9
7 鉆孔樁基礎(chǔ)工程施工方法 10
7.1 鉆孔樁施工 10
7.1.1 施工流程 10
7.1.2場地處理 10
7.1.3工程樁測量 10
7.1.4樁孔施工 11
7.1.5鋼筋籠施工 11
7.1.6 樁芯混凝土施工 12
7.1.7工程樁檢查與驗收 13
7.1.8 質(zhì)量保證措施 13
7.1.9質(zhì)量技術(shù)措施 14
7.1.10保證安全措施 14
7.2土方挖運 15
7.2.1土方開挖方案 15
7.2.2土方開挖組織 15
7.2.3沖洗槽設(shè)置 15
7.3 承臺地梁施工 15
7.3.1承臺施工 15
7.4 土方回填 16
7.4.1 施工準備 16
7.4.2 操作工藝 16
7.4.3 質(zhì)量標準 17
7.4.4 施工注意事項 17
7.5 墩柱、臺身、蓋梁 17
8 施工方案 20
8.1主要工序的施工技術(shù) 20
9 設(shè)備進場注意事項 22
10結(jié)論 24
致謝 25
附錄A 26
附錄B原文 46
附錄C譯文 63
參考文獻 73
各種配筋圖均有 格式為cad格式