特级做A爰片毛片免费69,永久免费AV无码不卡在线观看,国产精品无码av地址一,久久无码色综合中文字幕

亞泰哈建材工業(yè)園設(shè)計(jì)(畢業(yè)設(shè)計(jì)全套).rar

RAR格式版權(quán)申訴手機(jī)打開(kāi)展開(kāi)

亞泰哈建材工業(yè)園設(shè)計(jì)(畢業(yè)設(shè)計(jì)全套),亞泰哈建材工業(yè)園——綜合樓設(shè)計(jì):(畢業(yè)設(shè)計(jì)全套)內(nèi)附:畢業(yè)設(shè)計(jì)計(jì)算書(shū)、畢業(yè)設(shè)計(jì)設(shè)計(jì)任務(wù)書(shū)、畢業(yè)設(shè)計(jì)開(kāi)題報(bào)告、畢業(yè)實(shí)習(xí)總結(jié)、建筑圖7張、結(jié)構(gòu)施工圖10張。畢業(yè)設(shè)計(jì)計(jì)算書(shū)紙張:16開(kāi)字?jǐn)?shù):14829字頁(yè)數(shù):76頁(yè) (標(biāo)準(zhǔn)的排版格式,并附有完整、正確的英文目錄和英文摘要、設(shè)計(jì)文獻(xiàn))亞泰哈建材工業(yè)園一期年產(chǎn)45萬(wàn)立方米商混生產(chǎn)...
編號(hào):213-164380大小:2.79M
分類: 論文>土木工程/建筑論文

該文檔為壓縮文件,包含的文件列表如下:

內(nèi)容介紹

原文檔由會(huì)員 白癡學(xué)東西 發(fā)布

亞泰哈建材工業(yè)園——綜合樓設(shè)計(jì):(畢業(yè)設(shè)計(jì)全套)
內(nèi)附:畢業(yè)設(shè)計(jì)計(jì)算書(shū)、畢業(yè)設(shè)計(jì)設(shè)計(jì)任務(wù)書(shū)、畢業(yè)設(shè)計(jì)開(kāi)題報(bào)告、畢業(yè)實(shí)習(xí)總結(jié)、建筑圖7張、結(jié)構(gòu)施工圖10張。

畢業(yè)設(shè)計(jì)計(jì)算書(shū)
紙 張:16開(kāi)
字 數(shù):14829字
頁(yè) 數(shù):76頁(yè)
(標(biāo)準(zhǔn)的排版格式,并附有完整、正確的英文目錄和英文摘要、設(shè)計(jì)文獻(xiàn))

亞泰哈建材工業(yè)園一期年產(chǎn)45萬(wàn)立方米商混生產(chǎn)線-綜合樓(結(jié)構(gòu)施工圖10個(gè)圖):
(1樓梯配筋圖 、節(jié)點(diǎn)詳圖
2四層頂梁平法施工圖
3一層頂梁平法施工圖
4四層頂板配筋圖
5一層頂板配筋圖
6四層柱平法施工圖
7一層柱平法施工圖、地溝圖
8基礎(chǔ)梁平法配筋圖
9基礎(chǔ)布置圖
10結(jié)構(gòu)設(shè)計(jì)總說(shuō)明)

亞泰哈建材工業(yè)園一期年產(chǎn)45萬(wàn)立方米商混生產(chǎn)線-綜合樓(建筑圖7個(gè)圖):
(1建筑設(shè)計(jì)說(shuō)明、圖紙目錄、室內(nèi)裝修做法表、2一層平面圖、3二、三層平面圖、4四層平面圖、5屋面排水平面圖、61-15軸立面圖15-1軸立面圖、7軸A-G立面圖G-A軸立面圖1-1 、剖面圖2-2 、剖面圖3-3)

摘 要
本設(shè)計(jì)為亞泰哈建材工業(yè)園——綜合樓設(shè)計(jì)的整體過(guò)程。按照設(shè)計(jì)要求,依據(jù)現(xiàn)行《建筑設(shè)計(jì)規(guī)范》和《結(jié)構(gòu)設(shè)計(jì)規(guī)范》,完成本設(shè)計(jì)。設(shè)計(jì)分為建筑設(shè)計(jì)、結(jié)構(gòu)設(shè)計(jì)兩大部分。建筑部分包括建筑設(shè)計(jì)要點(diǎn)、建筑平面設(shè)計(jì)、立面設(shè)計(jì)、剖面設(shè)計(jì)等。結(jié)構(gòu)設(shè)計(jì)選擇鋼筋混凝土框架結(jié)構(gòu)進(jìn)行設(shè)計(jì),主要包括結(jié)構(gòu)選型(包括梁、柱、樓板、屋面板、樓梯等);結(jié)構(gòu)布置方案;選用有代表性的單元確定計(jì)算簡(jiǎn)圖、計(jì)算荷載、進(jìn)行內(nèi)力分析和內(nèi)力組合,對(duì)構(gòu)件進(jìn)行截面設(shè)計(jì)及截面配筋設(shè)計(jì);計(jì)算豎向荷載(恒載、活荷載、以及雪荷載)作用下的結(jié)構(gòu)內(nèi)力,找出最不利的一組或幾組內(nèi)力組合;選取最安全的結(jié)果計(jì)算配筋并繪圖,此外還進(jìn)行了結(jié)構(gòu)方案中的室內(nèi)樓梯的設(shè)計(jì)(完成了平臺(tái)板、梯段板、平臺(tái)梁等構(gòu)件的內(nèi)力和配筋計(jì)算及施工圖的繪制)。用結(jié)構(gòu)分析軟件(PKPM)進(jìn)行驗(yàn)算,并對(duì)手算和電算結(jié)果進(jìn)行比較分析。

關(guān)鍵詞:結(jié)構(gòu)設(shè)計(jì);框架結(jié)構(gòu);內(nèi)力組合

Abstract
The building is designed to Yatai Ha Industrial Park - Building design of the overall process. In accordance with the design requirements, based on the current "building design"and" structural design", complete the design. Design into architectural design, structural design of two parts. Part of the building, including architectural elements, architectural graphic design, facade design, profile design. Structural design options for the design of reinforced concrete frame structure, including structure selection (including beams, columns, floors, roof, stairs, etc.); Structural layout plan; unit to determine a representative selection of calculation diagram, load calculation, the internal force and internal force combination, the cross section of the component design and reinforcement design section; Calculation of vertical load (dead load, live load, and snow load) structure under the action of internal forces, to identify the most disadvantaged group or several groups of internal forces of a portfolio; Selected results of the most secure computing and reinforcement drawings, in addition to the structure of the program design of the staircases in the interior (complete the platform board, bench plate, platform and other components of the internal forces and beam reinforcement calculation and construction of mapping) . With structural analysis software (PKPM) checking, and rival operators and ICC results were compared.

Keywords: structural design; frame structure; internal force combination.

目 錄
摘 要 Ⅰ
英文摘要 Ⅱ
第1章 建筑設(shè)計(jì)說(shuō)明 1
1.1 建筑方案及平面布置 1
1.2建筑平面設(shè)計(jì) 1
1.3 建筑剖面設(shè)計(jì) 2
1.3.1房間的剖面形狀 2
1.3.2房屋各部分高度的確定2
1.3.3樓梯的設(shè)計(jì) 2
1.4建筑細(xì)部設(shè)計(jì) 3
1.4.1屋樓面做法 3
1.4.2墻體細(xì)部 4
1.4.3 衛(wèi)生間設(shè)計(jì) 4
1.4.4屋面防水與排水 4
1.5建筑防火設(shè)計(jì) 5
第2章 結(jié)構(gòu)布置及計(jì)算簡(jiǎn)圖確定6
2.1 結(jié)構(gòu)布置及梁、柱截面尺寸的初選6
2.1.1梁板的截面尺寸 6
2.1.2柱截面尺寸 6
2.2 框架結(jié)構(gòu)的計(jì)算簡(jiǎn)圖 7
第3章 框架結(jié)構(gòu)設(shè)計(jì) 10
3.1荷載標(biāo)準(zhǔn)值計(jì)算 10
3.1.1屋面及樓面恒荷載標(biāo)準(zhǔn)值 10
3.1.2屋面及樓面活荷載標(biāo)準(zhǔn)值 11
3.1.3梁,柱,墻,門(mén)窗重力荷載計(jì)算 11
3.1.4 重力荷載代表值 14
3.2橫向框架側(cè)移剛度計(jì)算 14
3.3 橫向水平地震作用下框架結(jié)構(gòu)內(nèi)力和側(cè)移計(jì)算 16
3.3.1橫向自振周期 16
3.3.2 水平地震作用及樓層地震剪力計(jì)算 17
3.3.3 水平地震作用下的位移驗(yàn)算 18
3.3.4 水平地震作用下框架內(nèi)力計(jì)算 19
3.4 橫向水平風(fēng)荷載作用下框架結(jié)構(gòu)內(nèi)力和側(cè)移計(jì)算 22
3.4.1 風(fēng)荷載標(biāo)準(zhǔn)值 22
3.4.2 風(fēng)荷載作用下水平位移驗(yàn)算 24
3.4.3 風(fēng)荷載作用下框架結(jié)構(gòu)內(nèi)力計(jì)算 24
3.5 豎向荷載作用下框架內(nèi)力計(jì)算 26
3.5.1 橫向框架內(nèi)力計(jì)算 26
3.6 橫向框架內(nèi)力組合 33
3.6.1結(jié)構(gòu)抗震等級(jí) 33
3.6.2 框架梁內(nèi)力組合 33
3.6.3 框架柱內(nèi)力組合 40
3.7截面設(shè)計(jì) 43
3.7.1 框架梁設(shè)計(jì) 43
3.7.2 框架柱截面設(shè)計(jì) 46
第4章 樓板結(jié)構(gòu)設(shè)計(jì) 51
4.1 設(shè)計(jì)資料 51
4.2 荷載計(jì)算 52
4.3 板的配筋計(jì)算 52
第5章 樓梯的結(jié)構(gòu)設(shè)計(jì) 56
5.1梯段斜板的設(shè)計(jì) 56
5.1.1 荷載計(jì)算 57
5.1.2 荷載效應(yīng)組合 57
5.1.3截面設(shè)計(jì) 57
5.2 平臺(tái)板設(shè)計(jì) 58
5.2.1 荷載計(jì)算 58
5.2.2荷載組合 58
5.2.3 截面設(shè)計(jì) 59
5.3平臺(tái)梁的設(shè)計(jì) 60
5.3.1荷載計(jì)算 60
5.3.2荷載組合 60
5.3.3 截面設(shè)計(jì) 60
第6章 基礎(chǔ)設(shè)計(jì) 62
6.1設(shè)計(jì)資料 62
6.2 A柱柱下獨(dú)..